payload integration造句
例句與造句
- The engineering team continues developing options for payload integration with the Dragon capsule.
- NASA's Launch Services Program at Kennedy Space Center managed the payload integration and launch.
- In the last week of September 2006, the " Dawn " mission's instrument payload integration reached full functionality.
- In 1987 he was named manager of the Habitability Module Office, and in 1989 he was named chief engineer of the Spacelab Payload Integration for the Payload Projects Office.
- He joined NASA's Jet Propulsion Laboratory ( JPL ) as payload integration engineer that year and except for a three-year span in the early 1980s has worked at JPL since.
- It's difficult to find payload integration in a sentence. 用payload integration造句挺難的
- After completing a management course with the Lockheed Management Institute at Santa Clara University in 1965, he became the payload integration manager for the International Telephone and Telegraph in Fort Wayne, Indiana.
- This division, which grew to over 1, 000 people, provided payload integration for all Spacelab projects at the Marshall Space Flight Center and had a substantial role in the development of the U . S . laboratory for the International Space Station.
- Space Vector also provides launch services as a prime contractor under the Air Force Space and Missile Systems Center ( SMC ) Sounding Rocket Program ( SRP-3 ) which includes performing vehicle integration activities, end-to-end system testing, payload integration, launch operations, and mission analysis and design.
- As of 2015, the most recent Pegasus XL to be purchased a planned June 2017 launch of NASA's Ionospheric Connection Explorer mission had a total cost of $ 56.3 million, which NASA notes includes " firm-fixed launch service costs, spacecraft processing, payload integration, tracking, data and telemetry and other launch support requirements ."
- The Division's findings helped justify the need for an off-line Shuttle Payload Integration Facility ( SPIF ), and they convinced the AFSC Commander to approve the SMAB's west bay as the site for the SPIF in January 1979 . As work on the SPIF got underway, the 6555th Aerospace Test Group formed the STS / IUS Site Activation Team in September 1981 to address problems associated with the first IUS processed aboard the Shuttle.